guide · Source published date unknown
Data Centers — public value, public costs and the evidence between them
A source-backed guide to electricity, water, noise, work, public revenue, infrastructure and community terms around data centers.

20 items for “farm”: records, experiences, guides and model families. Source reports remain distinct from discoveries.
guide · Source published date unknown
A source-backed guide to electricity, water, noise, work, public revenue, infrastructure and community terms around data centers.
guide · Source published date unknown
Start with the measurement, the geography and the time period—not a household analogy.
source-report · Source published date unknown
A National Science Foundation-funded project plans to combine sensors, drones, mobile robots and machine learning for early warning and decision support in corn and rice systems.
source-report · Source published date unknown
USDA ARS describes its Digital Agriculture Systems Hub, including a low-cost autonomous field robot that captures plant images used to train machine-learning models.
discovery · Source published 2025-01-24
A study combined image-based tillage classification, soil sensors, weather, slope, and crop inputs to recommend tilling intensity and fertilizer amount; authors report stationary prototypes deployed on 155 farms across five countries.
discovery · Source published 2025-06-24
A machine drives a vegetable field, photographs every plant, decides which are weeds, and burns them with short laser pulses. In 2024 field trials in New Jersey and New York, it controlled weeds as well as or better than the standard herbicide programme.
discovery · Source published 2026-06-16
İmeceMobil analyzes satellite imagery for crop and water conditions and sends local weather and pest alerts; one grower reported reducing a three-to-four-hour task to about 45 minutes.
discovery · Source published 2025-07-09
An AEP Ohio tariff effective July 23, 2025 requires a load study for new or expanding data-center requests of at least 25 megawatts and creates minimum-demand, collateral and cancellation obligations.
discovery · Source published 2026-07-06
Quincy owns and operates a reuse utility financed by Microsoft. EPA estimates that recirculating cooling-water blowdown avoids 138 million gallons a year of potable-groundwater demand; the loop still needs canal and groundwater make-up water.
discovery · Source published date unknown
Loudoun County reports $1.2 billion in data-center property-tax revenue for FY 2026 and projects $1.3 billion—40% of the county budget—for FY 2027, while maintaining a reserve for volatility.
discovery · Source published 2025-08-27
Mäntsälä’s utility has circulated recovered server heat into the town-centre district-heating network since 2015. Nivos said in 2025 that it supplied about one-third of the network’s heat.
discovery · Source published 2026-05-29
Saint Martin’s University reports that 19 of 20 Spring 2026 data-center technician graduates received Oracle offers after a 12-week program; reported average starting pay was about $80,000 plus relocation.
discovery · Source published date unknown
Google publishes a technician day-in-the-life video and a careers guide spanning hardware, electrical, cooling, network, logistics, and site operations. The material is useful for role orientation, not a verified worker outcome.
discovery · Source published 2022-10-19
Google’s 2022 profile says KP Philpot moved from contractor site-safety work on a data-center build into an environmental health and safety role at Alphabet’s Douglas County campus.
discovery · Source published 2025-06-27
New Albany’s 2024 financial report describes about 200 existing Meta campus employees and 1,200 construction workers on the expansion site, while labeling 300 employees and 1,800 construction workers as future estimates.
discovery · Source published 2026-05-27
Pennsylvania’s May 2026 GRID standards make investment, workforce, energy, water and community commitments conditions of Commonwealth support; the thresholds are commitments, not jobs or savings already delivered.
discovery · Source published 2025-12-18
A December 2025 FERC order directed PJM to create service paths for large co-located loads, require payment for grid services, and assign specified reliability-upgrade costs before existing generation can redirect capacity.
discovery · Source published 2019-05-01
DOE reports that NREL’s thermosyphon hybrid system avoided 2.10 million gallons over two years and cut data-center water use in half by using dry heat rejection when weather allowed while retaining a cooling tower for peak conditions.
discovery · Source published 2026-07-16
East Brandywine Township’s July 2026 ordinance requires qualified preconstruction modeling and an as-built study within 180 days, including peak cooling, generators under load, low-frequency sound, calibration records, corrective action and retesting.
discovery · Source published date unknown
Pennsylvania’s February 2026 report estimates rising forgone revenue from its computer data-center equipment exemption; the figures are projections, not a net-benefit calculation.